Solutions — Hoarding Solutions
SPEC.002 / SOLUTIONS
EXCLUSIVE LOMAX® AGENT · KUWAIT

The Lomax® System.
Now in Kuwait.

Free-standing. Damage-free. Australia-engineered.

The same engineered hoarding system deployed at Dubai Mall, Westfield, and the world’s leading retail destinations — exclusively delivered in Kuwait by Hoarding Solutions.

Download Lomax® Brochure (PDF)
Lomax System — Free-Standing Hoarding
— Powered By
8m
Free-Standing
Height
46cm
Compact
Footprint
0
Fixings
Required
AS4687
Certified
System
100%
Modular
& Reusable
The System · Powered by Lomax®

Engineered to Disappear.

Free-standing up to 8 metres. Zero fixings to floors or walls.
Modular, reusable, structurally certified to AS4687.

— Live Build Sequence · 5 Steps
Lomax System — 5-Step Build Sequence (animated)

Stack weights · Insert stud · Insert support post · Attach panels · Add cross beam.
From flat-packed components to engineered hoarding — in five moves.

Lomax System — Engineering Detail
8m
Free-Standing Height
Up to 8m indoors with zero fixings to surrounding structures.
46cm
Compact Footprint
The narrowest free-standing system on the market. Preserves valuable mall floor space.
0 fixings
Damage-Free Installation
No drilling. No anchors. No reinstatement work after the project.
AS4687
Internationally Certified
Independently structural engineer tested. Compliant with Australian Hoarding & Fencing Code.
100%
Modular & Reusable
Patented modular components. Deployed and recovered intact, project after project.
What We Deliver · 04

Four Solutions.
One Standard.

End-to-end hoarding execution.
Engineered worldwide. Delivered in Kuwait.

Indoor Hoarding
01
SOLUTION 01 · INDOOR

Indoor
Hoarding

Premium hoarding for live malls. Free-standing up to 8 metres with zero damage to store fronts, finished floors, or surrounding structures.

8m
Max Height
46cm
Footprint
0
Fixings
View Indoor Spec
Outdoor Hoarding
02
SOLUTION 02 · OUTDOOR

Outdoor
Hoarding

Wind-rated modular systems. Free-standing up to 4 metres. Weather-resistant and structurally certified to handle wind speeds up to 122 km/h.

4m
Max Height
122km/h
Wind-Rated
0
Fixings
View Outdoor Spec
Hoarding Art
03
PREMIUM SERVICE · ON-DEMAND

Hoarding
Art

Custom 3D builds and sculptural hoarding. For brands that want their reveal to become the destination — not just the storefront. Six creative dimensions, one accountable team.

6
Creative
Dimensions
3D
Sculptural
Builds
Brand
Possibilities
View Art Capabilities
Large-Format Printing
04
SOLUTION 04 · PRINT STUDIO

Large-Format
Printing

In-house print studio. You send the artwork — we handle pre-press, print, finish, and install. No third-party print vendors, no coordination overhead, no compromise on finish.

In-House
Production
File→Install
Full Pipeline
0
Handoffs
View Print Capabilities
The Problem · Four Costs, One Legacy Method

What Traditional Hoarding
Leaves Behind.

Traditional hoarding solves a short-term problem — and creates several long-term ones. We engineered every one of them out.

01

Drilled into your property

Permanent fixings leave holes, marks, and reinstatement work after the project — costs that surface long after the hoarding is gone.

Hidden Cost:Floor Repair
02

Days, not hours

Site-built hoarding delays fit-out access and pushes opening timelines. Every day lost is rental revenue lost.

Hidden Cost:Delayed Opening
03

Multiple vendors. One mess.

Survey, artwork, print, install, maintain, and dismantle — managed by different vendors. No single accountability when something fails.

Hidden Cost:Coordination Overhead
04

Gone, but not forgotten

After dismantling, you’re left with holes, patches, and finishing work that was never part of the original scope or budget.

Hidden Cost:Scope Creep

We engineered every one of them out.

How We Work · From First Call to Final Dismantle

One Project.
One Partner.

Six stages, engineered as a single accountable process. You stay informed. We stay accountable.

01

Enquire

You share your project requirements. We respond within 24 hours.

Your Input
02

Survey

Our team measures and assesses your space — fast and detailed.

We Handle
03

Quote

Configuration, artwork direction, and timeline — delivered within 24h of the survey.

We Handle
04

Install

Modular system deployed on the agreed date. Minimal disruption.

We Handle
05

Maintain

On-site service and rapid response through the project lifecycle.

We Handle
06

Dismantle

Clean removal. No traces. No damage. No reinstatement.

We Handle
— Our Promise

A dedicated point of contact.

Every project gets one person, one number, one accountability. You don’t chase departments. You don’t repeat yourself across vendors. You don’t manage handoffs. We do.

Ready to Start · Free Site Visit · Zero Obligation

Let’s Design Your

Next Hoarding.

Site Visit in 24h · Quote in 24h · One Partner — End-to-End